Town Package Maximum Earning Capability

TOWN Package maximum production capability is 400 pieces of garments per day (based on eight hours). *Example of gross dollar volume for this package is 400 pieces per day X $4.00 (i.e. price for one pair of trousers = one piece), = $1,600.00 per day. = $9,600.00 per six day week. = $41,280.00 per month (4.3 weeks per month). = $495,360.00 per year.

TOWN Package Equipment and Services

TOWN Package Store Includes:

Financing Available for qualified buyer.

One Columbia Hydrocarbon Dry Cleaning Machine
One Conveyor Straight or Up-down with Slick Rail
One 9.5 HP Boiler
One Air Compressor
One 375 Pants/skirt Finisher Video
One 379 MultiFomr Tensioning Finisher Video
Two 102 Up-air/vacuum Finishing Board Video
One Spotting Table
One 389 Deluxe Shirt Finisher Video
One 387 Collar/cuff Press Video
One High Speed Extraction Washer
One 50-Pound Dryer
One Collar Form & Damp Box
One Scale Cart
One Bagger System
One 50-Gallon Hot Water Heater
One Computer System with Cash Drawer
Two Six-Foot Counters & One Make-in Counter
Start-up Supplies Allowance ($3,000.00)
Grand Opening Custom Mailers
Full On Site Training

Installation, Rigging, and Freight.
Business Operation Training.
Equipment Operation Skills Training
Equipment Maintenance Training
Business Operation Manual
Area Demographics
Floor Plan Drawings

A minimum 20% down payment with a signed contract, remaining balance and total cost due via agreed installments up through and upon store opening and completion of project and training.


Additional up charge for International dry cleaning and laundry sales. Dependent on freight cost and currency exchange.

*Disclaimer: The above estimated gross revenue is based on the equipment mix maximum production and not a guarantee. The amount you earn may be lower or greater than the above example; and is subject to a variety of factors including local territory, owner's and/or operator's marketing efforts, and hours dedicated to building the business, national economy, acts of God, and other factors. The investment price includes the installation of the listed equipment, but does not include build-out, electrical, vent work, gas line to building, water lines to building, and sewer lines to building.